The drawings — standard details referenced by index number in construction plans (e.g., 700-series signing, 711 markings, 102-series temporary traffic control, 522-002 curb ramps, 6xx signals).

Why: plans say “per Index 711-001”; you must be able to open the right index instantly. Quantities and reviews hinge on these details.

When:

  • S&PM design/review
  • MOT plans
  • ADA ramps
  • signal hardware details
  • quantity takeoffs

Example questions:

  • stop bar placement/size?
  • sign post embedment?
  • lane-closure taper per 102-603?
  • detectable warning placement?

Spawn: an index cheat-sheet note per plan type you touch (SPM Plan Review Checklist links the common ones).

Related: FDOT Standard Specifications (words to these pictures) · MUTCD